Waste-to-Energy

Shanghai Jiangqiao
MSW Incineration Plant

The Shanghai Jiangqiao MSW Incineration Plant is located in Jiading District of Shanghai. The facility sits on a 13.6-hectare piece of land with a total area built of 35,000 m². This is one of the largest incineration plants in China treating approximately 10% of municipal waste generated in Shanghai.


The facility includes three incinerators each with a capacity of 500 metric tons per day and two 12.5 MW turbine generators. The technology and main equipment are from Europe.

In 2008, Veolia China has become one of the owners of the facility and meanwhile, taking charge of its operation and maintenance through a concession agreement.